It is especially important to accurately identify the main factors that influence construction safety, analyze the working mechanism, and construct the system of influential factors in construction risk management. Firstly, this study screened out 14 main factors of construction risk and formed 6 levels of risk, like personnel factor, mechanical factor, environmental factor, management factor, and other factors based on analysis of direct and indirect causes of construction safety accidents. Secondly, this study also calculated the adjacency matrix and reachable matrix of construction safety risk factors and judged the relationship of the matrixes by use of MATLAB software. The study constructed an Interpretation Structure Model(ISM) and a hierarchical structure diagram to determine the hierarchical relationship among the influential factors and classified the influential factors according to the dependence and driving force using Matrix Impacts Cross-reference Multiplication Applied to a Classification(MICMAC). Finally, the study calculated a case using the established ISM model and MICMAC method to verify the feasibility of the application. The results show that the influential factors of the construction safety risk are divided into 6 levels(Li, i = 1-6) and the importance increases accordingly. Based on the dependence and driving force, the influential factors were divided into three categories: autonomous cluster, independent cluster, and dependent cluster. Human behavior and the safe state of facilities and equipment were at the level of L1 in the ISM model, with the low driving force and strong dependence, belonging to a dependent cluster. Management system, safety inspection, supervision, and management departments were at the level of L6 in the ISM model, with a potent driving force and low dependence, belonging to an independent cluster. It is concluded that human behavior and the safe state of facilities and equipment are important causes of construction safety risks. Management systems, safety inspection, supervision, and management departments are the most fundamental factors that constitute the risk of construction and need more attention. The model and method are feasible and effective to excavate risk factors, construction risk factor systems, analyze and determine the level, driving force, and dependence of risk factors, formulate corresponding risk management countermeasures and prevent and dissolve construction risks.
[1] 住房和城乡建设部办公厅.住房和城乡建设部办公厅关于2019年房屋市政工程生产安全事故情况的通报[EB/OL].[2020-06-19].http://www.mohurd.gov.cn/wjfb/202006/t20200624_246031.html.General Office of the Ministry of Housing and Urban-Rural.General Office of the Ministry of Housing and Urban-Rural Development on the 2019 housing municipal engineering production safety accidents[EB/OL].[2020-06-19].http://www.mohurd.gov.cn/wjfb/202006/t20200624_246031.html.
[2] SEO J W,CHOI H H.Risk-based safety impact assessment methodology for underground construction projects in Korea[J].Journal of Construction Engineering and Management,2008,134(1):72-81.
[3] 宫培松,张先锋,丁丽萍.基于ISM的地铁施工安全风险评价模型构建[J].施工技术,2015,44(S2):321-325.GONG P S,ZHANG X F,DING L P.The construction of safety risk assessment model for subway construction based on ISM[J].Construction Technology,2015,44(S2):321-325.
[4] 吴晗,陈大伟.基于ISM和AHP方法的建筑施工高处坠落事故风险因素分析[J].建筑安全,2018,33(10):52-56.WU H,CHEN D W.Risk factors analysis of fall accident based on ISM and AHP methods[J].Building Safety,2018,33(10):52-56.
[5] HATEFI S M,TAMOSAITIEN J.An integrated fuzzy DEMATEL-fuzzy ANP model for evaluating construction projects by considering interrelationships among risk factors[J].Journal of Civil Engineering and Management,2019,25(2):114-131.
[6] 吴静涵,江新,周开松,等.地下洞室施工安全风险综合评价——基于ISM-ANP的灰色聚类分析[J].人民长江,2020,51(6):159-165.WU J H,JIANG X,ZHOU K S,et al.The comprehensive evaluation of construction safety risk in underground tunnel—grey clustering analysis based on ISM-ANP[J].People's Yangtze River,2020,51(6):159-165.
[7] 仇国芳,郑艳,张涑贤.基于ISM的建筑施工高处坠落事故致因分析[J].安全与环境学报,2019,19(3):867-873.QIU G F,ZHENG Y,ZHENG S X.Analysis of the casualty causes of falling accidents in construction sites based on ISM model[J].Journal of Safety and Environment,2019,19(3):867-873.
[8] 贾凡.基于解释结构模型和MICMAC的城市交通拥堵问题分析[J].河北大学学报(自然科学版),2020,40(4):344-350.JIA F.Analysis of urban traffic congestion based on interpreted structure model and MICMAC[J].Journal of Hebei University (Natural Science Edition),2020,40(4):344-350.
[9] 江小燕,闫碧琼,于竞宇,等.基于ISM-fuzzy MICMAC方法的PPP项目关键风险层级关系识别[J].土木工程与管理学报,2018,35(6):70-77.JIANG X Y,YAN B Q,YU J Y,et al.Key risk hierarchy identification for PPP projects based on ISM-fuzzy MICMAC method[J].Journal of Civil Engineering and Management,2018,35(6):70-77.
[10] 刘光忱,温振迪,何雪礼,等.基于ISM-MICMAC的装配式建筑质量影响因素[J].土木工程与管理学报,2019,36(5):33-39.LIU G C,WEN Z D,HE X L,et al.Influence factors of prefabricated building quality based on ISM-MICMAC[J].Journal of Civil Engineering and Management,2019,36(5):33-39.
[11] 郭礼扬.基于改进ISM和MICMAC模型的地铁火灾风险因素研究[J].武汉理工大学学报,2017,39(4):36-41,51.GUO L Y.Study on the risk factors of subway fire based on improved ISM and MICMAC model[J].Journal of Wuhan University of Technology,2017,39(4):36-41,51.
[12] 段永辉,周诗雨,郭一斌,等.基于SEM的装配式建筑施工安全风险及策略[J].土木工程与管理学报,2020,37(2):70-75,121.DUAN Y H,ZHOU S Y,GUO Y B,et al.Safety risk and strategy of assembly building construction based on SEM[J].Journal of Civil Engineering and Management,2020,37(2):70-75,121.
[13] 郭婷,吕淑然,丁晓强.基于ISM和AHP分析的高层建筑施工风险影响因素研究[J].建筑安全,2020,35(5):51-54.GUO T,Lü S R,DING X Q.Study on influencing factors of construction risk of tall building based on ISM and AHP analysis[J].Building Safety,2020,35(5):51-54.
Basic Information:
DOI:10.13637/j.issn.1009-6094.2021.0578
China Classification Code:TU714
Citation Information:
[1]LI Ming-zhu,WANG Wen-dong,ZHANG Zhi-chao.Study on construction risk factors based on ISM and MICMAC[J].Journal of Safety and Environment,2022,22(01):22-28.DOI:10.13637/j.issn.1009-6094.2021.0578.
Fund Information:
2018年安全生产重大事故防治关键技术科技项目(jilin-0044-2018AQ)
2022-02-25
2022-02-25